Our Projects

GPSR has been incubating projects across India, completing various activities such as feedstock tie-ups, land selection, offtake tie-ups, capex, and OPEX estimations based on engineering, applicable statutory requirements, ESIA, etc.

Kakinada 1

Powering the Clean Energy Revolution

GPS Renewables drives large-scale biofuel adoption in India, converting waste into clean energy.

  • 4 RNG Plants - Including South Asia’s largest MSW-based BioCNG plant
  • 23+ Projects - Advancing India’s clean energy infrastructure
  • Diverse feedstocks - MSW, food waste, press mud & agro-residue
  • Nationwide Impact - Cutting emissions & landfill waste

From India’s fastest-commissioned CBG plants to pioneering gas purification, we accelerate the net-zero transition.

Madhya Pradesh

Bhopal

Madhya Pradesh

14 TPD (233,333 mmbtu)

CBG Output

Bhopal 2

Madhya Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Jabalpur

Madhya Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Indore

Madhya Pradesh

15.3 TPD (255,000 mmbtu) CBG Output

Uttar Pradesh

Barabanki

Uttar Pradesh

20 TPD (333,333 mmbtu) CBG Output

Chandauli

Uttar Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Haidergarh

Uttar Pradesh

20 TPD (333,333 mmbtu) CBG Output

Prayagraj

Uttar Pradesh

MSW PTU

Pilibhit

Uttar Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Haryana

Jind 1

Haryana

22.5 TPD (375,000 mmbtu) CBG Output

Jind 2

Haryana

22.5 TPD (375,000 mmbtu) CBG Output

Jhajjar 1

Haryana

20 TPD (333,333 mmbtu) CBG Output

Jhajjar 2

Haryana

22.5 TPD (375,000 mmbtu) CBG Output

Panipat

Haryana

15 TPD (250,000 mmbtu) CBG Output

Fatehbad

Haryana

15 TPD (250,000 mmbtu) CBG Output

Andhra Pradesh

Kakinada 1

Andhra Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Kakinada 2

Andhra Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Kakinada 3

Andhra Pradesh

22.5 TPD (375,000 mmbtu) CBG Output

Chhattisgarh

Raipur

Chattisgarh

15 TPD (250,000 mmbtu) CBG Output

Bilaspur

Chattisgarh

22.5 TPD (375,000 mmbtu) CBG Output

Rajasthan

Suratgarh

Rajasthan

21 TPD (350,000 mmbtu) CBG Output

Gujarat

Vadodara

Gujarat

MSW PTU

IOC GPS Renewables Projects

  • IGRPL (Indian Gas Renewables Pvt. Ltd.) is a 50:50 joint venture between Indian Oil Corporation Ltd. (IOCL) and GPS Renewables. With a planned capital outlay of up to 139 million USD, IGRPL marks a significant milestone in scaling up India’s bio-CNG infrastructure.

  • The joint venture aims to set up 10 compressed biogas (CBG) projects across the country. As of now, 9 of these projects are already under execution in Haryana, Uttar Pradesh, Andhra Pradesh and Chhattisgarh.

  • In addition to these, another 20 CBG projects are currently under incubation under IGRPL, reinforcing the JV’s commitment to accelerating India’s clean energy transition.

Uttar Pradesh

Jaunpur

Uttar Pradesh

15 TPD (250,000 mmbtu) CBG Output

Sitapur

Uttar Pradesh

15 TPD (250,000 mmbtu) CBG Output

Lakhimpur Kheri

Uttar Pradesh

15 TPD (250,000 mmbtu) CBG Output

Haryana

Jind

Haryana

15 TPD (250,000 mmbtu) CBG Output

Yamuna Nagar

Haryana

15 TPD (250,000 mmbtu) CBG Output

Kaithal

Haryana

15 TPD (250,000 mmbtu) CBG Output

Sirsa

Haryana

15 TPD (250,000 mmbtu) CBG Output

Andhra Pradesh

Vijayawada

NTR Dist., Andhra Pradesh

15 TPD (250,000 mmbtu) CBG Output

Chhattisgarh

Bemetara

Raipur, Chattisgarh

15 TPD (250,000 mmbtu) CBG Output

3,000,000 mmbtu

Commissioned

9,000,000 mmbtu

Under Construction

Agricultural Waste-Based Projects

Municipal Solid Waste (MSW) Projects

MSW Pre-Treatment Projects

Converting crop residue and other agricultural byproducts into biofuels:

Feedstock: Paddy Straw, Napier Grass, PressMud Cake, Mustard Trash and Cotton Stalk

Projects: Barabanki, Haidergarh, Pilibhit, Chandauli(Uttar Pradesh), Jind, Hisar, Jhajjar, Panipat (Haryana), Bhopal, Jabalpur(Madhya Pradesh), Raipur, Bilaspur(Chhattisgarh), Suratgarh(Rajasthan), Kakinada(Andhra Pradesh)

Processing organic waste from cities to produce biofuels:

Feedstock: Organic fraction of MSW

Projects: Bhopal (Madhya Pradesh), Indore (Madhya Pradesh)

MSW pre-treatment involves sorting and separating organic fractions from non-organic materials before further processing into biogas or biofuels:

Feedstock: MSW

Projects: Vadodara (Gujarat), Prayagraj (Uttar Pradesh)